Project record

Work delivered, documented and signed off

A selection of avionics installations and panel modernizations completed at Miami Executive Airport. Every entry closed with configuration data, functional test results and AS-INSTALLED documentation.

40+VERIFIED

Panels modernized

100%VERIFIED

Documented closeout

KTMBVERIFIED

Home base

PRJ-014

N—2 8 2 S T · 2025

DELIVERED

Aircraft

Cessna 182Q

Full glass cockpit conversion

Complete panel redesign around a dual-display glass suite, with new panel structure, lighting and a rebuilt forward harness.

Cessna 182Q panel before Full glass cockpit conversion
Before
Cessna 182Q panel after Full glass cockpit conversion
After

Systems installed

  • Garmin G3X Touch
  • GTN 650Xi
  • GFC 500 autopilot
  • GTX 345 ADS-B
Downtime
6 weeks
Closeout
AS-INSTALLED + Form 337

PRJ-013

N—5 8 B A R · 2025

DELIVERED

Aircraft

Beechcraft Baron 58

Twin-engine avionics modernization

Legacy radio stack removed, bus loading recalculated and dual-bus power distribution rebuilt for redundant navigation.

Photo slot — image pending
Before
Beechcraft Baron 58 panel after Twin-engine avionics modernization
After

Systems installed

  • Dual GI 275
  • GNC 355
  • GMA 345 audio panel
  • Engine data monitor
Downtime
8 weeks
Closeout
AS-INSTALLED + load analysis

PRJ-012

N—1 8 1 P A · 2024

DELIVERED

Aircraft

Piper PA-28-181

IFR-capable navigator upgrade

GPS navigator installation with annunciation, CDI integration and pitot-static and transponder certification on completion.

Photo slot — image pending
Before
Photo slot — image pending
After

Systems installed

  • GPS 175 navigator
  • GI 275 attitude
  • ADS-B Out compliance
Downtime
3 weeks
Closeout
Functional test report

PRJ-011

N—2 0 J M O · 2024

DELIVERED

Aircraft

Mooney M20J

Wiring harness rebuild & cleanup

Forty years of accumulated splices removed, harness re-fabricated to aviation standards with labeled bundles and documented pinouts.

Mooney M20J panel before Wiring harness rebuild & cleanup
Before
Mooney M20J panel after Wiring harness rebuild & cleanup
After

Systems installed

  • New forward harness
  • Bonding & shielding
  • Connector documentation
Downtime
4 weeks
Closeout
Pinout & interconnect set

PRJ-010

N—2 2 S R X · 2024

DELIVERED

Aircraft

Cirrus SR22

Autopilot & flight display integration

Autopilot integration with existing flight displays, including servo provisions, structural inspection and full functional check flight support.

Photo slot — image pending
Before
Photo slot — image pending
After

Systems installed

  • Autopilot integration
  • Servo provisions
  • Flight display interface
Downtime
5 weeks
Closeout
AS-INSTALLED package

PRJ-015

N—2 1 0 C E · 2026

IN WORK

Aircraft

Cessna 210N

Panel modernization in progress

Panel layout study and cutout engineering complete; fabrication and installation underway with a documented interconnect design.

Photo slot — image pending
Before
Photo slot — image pending
After

Systems installed

  • Panel fabrication
  • Glass display suite
  • Audio & COM refresh
Downtime
In work
Closeout
Scheduled

Your aircraft could be next in the log

Send the airframe, the mission and the systems you want. We return a scope, certification path and installation sequence.